The technical focus is the relationship between the line hardware, the insulation configuration and the tower-side connection points visible in the field record.
PROJECT OVERVIEW
Use the full project context to start a relevant discussion.
This Fengxin record relates to a 35kV overhead-line insulator and fitting upgrade in the mountainous area of western Jiangxi, with field work carried out around an established line structure.
- COUNTRY / REGION
- China / Fengxin, Yichun, Jiangxi
- VOLTAGE LEVEL
- 35kV
- SUPPLY OR PROJECT SCOPE
- Mountain-area overhead line insulator and fitting upgrade
- RECORD ON HAND
- Installation record supplied / field image available
FIELD GALLERY
Available project images.

For an upgrade scope, the review starts by matching the existing structure and line parameters to the replacement material route, then confirming drawing and packing requirements.
SIMILAR PROJECT?
Discuss a similar projectBring your line inputs to the next conversation.
Send the BOM, drawing, voltage level and destination country. Buzz and Bella will coordinate the next technical-supply step.
Request a Quote